황석주
| 2024-07-19 10:01:36
Work to reopen Jamsu Bridge
Work to reopen Jamsu (submersible) Bridge on the Han River in Seoul is under way on July 19, 2024, after the river's water level was lowered following days of torrential rains. (Yonhap)
(END)
[ⓒ K-VIBE. 무단전재-재배포 금지]